DISASTER
RESTORATION
SERVICES
COMMERCIAL/INDUSTRIAL
FLOOD & RESTORATION SERVICES
Water damage mitigation is the process of stabilizing, cleaning and completely drying affected building materials after sustaining any level of water damage. These damages can be caused by various sources such as flooding and pipe breaks. No matter the source or extent of damage, an immediate emergency response by V2 Solutions, Inc.’s trained technicians will quickly stabilize your property and control the extent of loss.
V2 Solutions, Inc. is proud to be part of an elite group of selected companies to have earned the IICRC Certified Firm designation. In order to qualify an IICRC Certified Firm must have Certified Technicians on each job site at all times to guarantee the correct protocol and professionalism is followed from start to finish on every job.
​
Reconstruction Services
V2 Solutions, Inc. provides reconstruction and remodeling for your commercial facility's improvement and post disaster projects. Our estimates include, but are not limited to, demolition, framing, drywall, painting and flooring. Please call our office at (312) 528-9050 to discuss your plans and schedule a visit with one of our estimators.
Our technicians are WRT [Water Restoration Technician] and ASD [Advanced Structural Drying ] Certified.
​
Visit www.iicrc.org for more industry information. View V2 Solutions, Inc.'s Certification Here >
WHY CHOOSE V2 SOLUTIONS, INC.
-
Readily available staff on call
-
Quick reaction time
-
Remediation & rebuild capabilities - all services under one (1) provider
-
Comprehensive experience work with the insurance companies
-
Technicians are Water Restoration Technician Certified
-
Project manager available to walk site with adjuster/property manager
-
Full client update within 24 hours - includes photos, humidity report, info on affect areas, site map if drawings available, & next steps
​
OUR PROCESS
TIME FRAME
1-5 Hours
PROCESS
- Receive call & deploy project manager within 2 hours
- Evaluate source & schedule repairs
- Take onsite readings/recordings
- Extract water to minimize damage to facility
24-48 Hours
- Remove saturated materials & disinfect
- Submit required drying equipment list for approval
24-48 Hours
- Set up job site to dry facility
2-4 Days
- Daily monitoring and project management
- Submit reconstruction proposal
- Provide construction schedule for approval
Dependent on facility size
SITE MAP EXAMPLE
Below is an example of the documents we provide during the process if drawings are available.
Water Extraction Site
Drywall Removed
Dehumidifiers & Dryer Locations
RECENT PROJECTS
WATER DAMAGE
BUFFALO GROVE
V2 Technicians arrived onside 45 minutes after initial call.
​
-
10,305 SF affected by water damage
-
Extracted 900 gallons of water
-
Removed and replaced drywall, baseboards & installation
-
Completely dried space within 5 days
-
Completed daily humidity readings & provided report to client
-
Restored water service & power
WATER DAMAGE
AURORA
V2 Solutions arrived onside 1 hour after initial call to remediate flood damage.
​
-
15,000 SF affected by water damage
-
Completed water extraction within 12 hours
-
Removed and replaced saturated ceiling tiles, wall paper, drywall, and flooring
-
Asbestos testing products before removal
Place V2 Solutions, Inc. in your company’s
Disaster Preparedness Plan or Emergency Contingency Plan
to be contacted in case of a water related emergency.
We will work with you to design a plan for your facility and staff should a flood occur.
Call (312) 528-9050.
Emergency After-Hours # (800) 475-8105